Skip to main content
Digital Archive Ontario Homepage
The Bridge. It's 10 per cent design and 90 per cent planning, Meetings and more meetings, but no traffic hold-ups to get this structure built
The Bridge. It's 10 per cent design and 90 per cent planning, Meetings and more meetings, but no traffic hold-ups to get this structure built

The Bridge. It's 10 per cent design and 90 per cent planning, Meetings and more meetings, but no traffic hold-ups to get this structure built

Date8/20/1968
Names
(photographer)
Alternate Title
  • The Bridge. It's 10 per cent design and 90 per cent planning, Meetings and more meetings, but no traffic hold-ups to get this structure built
  • The Bridge. It's 10 per cent design and 90 per cent planning; Meetings and more meetings; but no traffic hold-ups to get this structure built
FormatPicture
Notes
Original Toronto Star caption: The Bridge. It's 10 per cent design and 90 per cent planning; Meetings and more meetings; but no traffic hold-ups to get this structure built
Subject
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Copyright (Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0116504F
Geography
Geography
Geography
Geography
Geography
Geography
Geography
Geography
Geography
Geography
Geography
Rush bayview bridge for traffic opening
Toronto Star (Firm)
11/16/1929