Skip to main content
Digital Archive Ontario Homepage
The Bridge. It's 10 per cent design and 90 per cent planning, Meetings and more meetings, but no traffic hold-ups to get this structure built
The Bridge. It's 10 per cent design and 90 per cent planning, Meetings and more meetings, but no traffic hold-ups to get this structure built

The Bridge. It's 10 per cent design and 90 per cent planning, Meetings and more meetings, but no traffic hold-ups to get this structure built

Date8/20/1968
Names
(photographer)
FormatPicture
Notes
Original Toronto Star caption: The Bridge. It's 10 per cent design and 90 per cent planning; Meetings and more meetings; but no traffic hold-ups to get this structure built
Subject
    Language
      ProvenanceFrom the Toronto Star Archives
      Usage Rights Copyright (Learn More)
      Copyright HolderToronto Star (Firm)
      Object NumberTSPA_0116504F