Flood control plans for the Etobicoke river involving a three-way split of costs between three levels of government, would divert the stream from Bram(...)
Date4/17/1948
Names
Toronto Star (Firm)
(publisher)
Unknown
(photographer)
Alternate Title
- Flood control plans for the Etobicoke river involving a three-way split of costs between three levels of government; would divert the stream from Brampton's business centre as indicated. Estimated cost is $365;000
- Flood control plans for the Etobicoke river involving a three-way split of costs between three levels of government, would divert the stream from Bram(...)
FormatPicture
NotesOriginal Toronto Star caption: Flood control plans for the Etobicoke river involving a three-way split of costs between three levels of government; would divert the stream from Brampton's business centre as indicated. Estimated cost is $365;000
Medium
Language
ProvenanceFrom the Toronto Star Archives
CollectionToronto Star Photograph Archive
Usage Rights
Public Domain
(Learn More)
Call Number / Accession NumberTSPA_0106348F
Geography
Geography
Geography
Geography
Geography
Geography
Geography
Geography
Geography
Geography
Geography
Spremo, Boris
8/26/1982